JobTime®5
recognizes ‘Secondary Resource Constraint’s which include additional
modeling requirements: |
 | Modeling
overlapping tasks to maximize 'Just-in-Time', Parallel, From-Start,
and activity branches inside each work order; |
 | Allowing a
single operator to simultaneously tend two or more machines;
|
 | Labor
skill rankings in multiple skill categories, assignment of labor to
tasks by skill ranking; |
 | Schedule
Board shows both machines and assigned labor, tooling and any other
resources per task; |
 | Visibly
splitting operations across multiple work stations to saturate
available capacity; |
 | Accurately
modeling the competition of individual pieces of multiple orders in
shared production; |
 | Sequencing
orders to group exact setup
matches to reduce setup
changeovers for optimal efficiency; |
 | Sequencing
orders based on a From-To Setup Matrix reflecting all feasible
changeovers; |
 | Sequencing
that allows custom logic to enforce side-constraints like trait
grouping, horizon limit and over-rides; |
 | Earliest
time-of-day to let an operation ever be started, reflecting
environmental conditions of heat, humidity; |
 | Latest
time-of day to let an operation to prevent overnight operations
where unattended operation is infeasible; |
 | Seizing a
resource and holding it in place across a series of operations such
as a person, tool, tote, or machine |
 | Preventing
WIP obsolescence between operations by locking downstream capacity
before starting an upstream task |